12910 / Hazrat Nizamuddin - Bandra Terminal Garib Rath Express
हज़रत निज़ामुद्दीन - बांद्रा टर्मिनल गरीब रथ एक्सप्रेस

Departs @ 16:30 (Hazrat Nizamuddin)

SunMonTueWedThuFriSat

Arrives @ 09:15 +1 night (Bandra Terminus)

SunMonTueWedThuFriSat

The following table shows the schedule of 12910/Hazrat Nizamuddin - Bandra Terminal Garib Rath Express including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Hazrat Nizamuddin

Hazrat Nizamuddin - Bandra Terminal Garib Rath Express (12910) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 16:30

PF: 7

Day: 1

Arr.: 18:03

Halt: 2m

Dist: 134.0

Dep.: 18:05

PF: 4

Day: 1

Arr.: 21:15

Halt: 5m

Dist: 458.2

Dep.: 21:20

PF: 2

Day: 1

Arr.: 00:15

Halt: 3m

Dist: 724.8

Dep.: 00:18

PF: 4

Day: 2

Arr.: 03:55

Halt: 10m

Dist: 985.6

Dep.: 04:05

PF: 1

Day: 2

6. ST / Surat

Arr.: 05:37

Halt: 5m

Dist: 1115.3

Dep.: 05:42

PF: 2

Day: 2

Arr.: 08:27

Halt: 2m

Dist: 1348.8

Dep.: 08:29

PF: 8

Day: 2

Arr.: 09:15

-

Dist: 1367.2

Dep.: Dest

PF: 2

Day: 2

Last Updated: 12-Jul-24 10:22 IST

The 12910 is Garib Rath Express Superfast express train - Western Railway zone that runs between Hazrat Nizamuddin (हजरत निजामुद्दीन) and Bandra Terminus (बांद्रा ट.).

Train number 12909 in the reverse direction serving the states of Delhi, Rajasthan, Madhya Pradesh, Gujarat and Maharashtra.

The 12910 Hazrat Nizamuddin - Bandra Terminus Garib Rath Express (हजरत निजामुद्दीन - बांद्रा (ट.) गरीब रथ) presently has 15 AC 3 tier & 4 AC Chair Car coaches. It does not have a Pantry Car Coach.

12910 Garib Rath Express covers the distance of 1366 kilometres in 16 hours 35 mins making it the 2nd fastest train on the Mumbai – Delhi sector.

This train runs via Kota, Ratlam, Vadodara and Surat to Mumbai' Bandra Terminals.

Loco:
Prior to February 2012, Dual traction WCAM 2/2P locos would haul the train between Bandra Terminus & Vadodara Junction after which a Vadodara based WAP 5 locomotive would take over until Hazrat Nizamuddin.

Western Railway completed DC Electric Conversion to AC on 5 February 2012 & it is now regularly hauled by a Ghaziabad or Vadodara based WAP 5 or WAP 7 locomotive for its entire journey.