16022 / Kaveri Express
कावेरी एक्सप्रेस
(காவேரி விரைவு வண்டி)

Departs @ 21:00 (Mysuru Junction)

SunMonTueWedThuFriSat

Arrives @ 06:45 +1 night (MGR Chennai Central)

SunMonTueWedThuFriSat

The following table shows the schedule of 16022/Kaveri Express including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Mysuru Junction

Kaveri Express (16022) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 21:00

PF: 1

Day: 1

Arr.: 21:19

Halt: 1m

Dist: 19.0

Dep.: 21:20

PF: 1

Day: 1

3. MYA / Mandya

Arr.: 21:40

Halt: 2m

Dist: 44.6

Dep.: 21:42

PF: 3

Day: 1

4. MAD / Maddur

Arr.: 21:58

Halt: 1m

Dist: 63.7

Dep.: 21:59

PF: 2

Day: 1

Arr.: 22:14

Halt: 1m

Dist: 82.0

Dep.: 22:15

PF: 3

Day: 1

Arr.: 22:25

Halt: 1m

Dist: 93.2

Dep.: 22:26

PF: 2

Day: 1

Arr.: 22:52

Halt: 2m

Dist: 125.5

Dep.: 22:54

PF: 2

Day: 1

Arr.: 23:45

Halt: 5m

Dist: 137.6

Dep.: 23:50

PF: 5

Day: 1

Arr.: 00:01

Halt: 1m

Dist: 141.9

Dep.: 00:02

PF: 2

Day: 2

Arr.: 00:09

Halt: 1m

Dist: 151.4

Dep.: 00:10

PF: 2

Day: 2

Arr.: 00:23

Halt: 1m

Dist: 160.8

Dep.: 00:24

PF: 2

Day: 2

Arr.: 01:05

Halt: 1m

Dist: 207.7

Dep.: 01:06

PF: 4

Day: 2

13. KPN / Kuppam

Arr.: 01:29

Halt: 1m

Dist: 241.9

Dep.: 01:30

PF: 1

Day: 2

Arr.: 02:35

Halt: 5m

Dist: 282.5

Dep.: 02:40

PF: 5

Day: 2

Arr.: 03:53

Halt: 2m

Dist: 367.0

Dep.: 03:55

PF: 2

Day: 2

Arr.: 04:13

Halt: 2m

Dist: 391.6

Dep.: 04:15

PF: 2

Day: 2

Arr.: 04:28

Halt: 2m

Dist: 406.6

Dep.: 04:30

PF: 2

Day: 2

Arr.: 04:38

Halt: 2m

Dist: 416.3

Dep.: 04:40

PF: -

Day: 2

Arr.: 05:03

Halt: 2m

Dist: 428.0

Dep.: 05:05

PF: 2

Day: 2

Arr.: 05:28

Halt: 2m

Dist: 455.0

Dep.: 05:30

PF: 1

Day: 2

Arr.: 05:58

Halt: 2m

Dist: 491.1

Dep.: 06:00

PF: 1

Day: 2

Arr.: 06:45

-

Dist: 496.6

Dep.: Dest

PF: 8

Day: 2

Last Updated: 18-Nov-22 08:13 IST
16022 / Kaveri Express (कावेरी एक्सप्रेस / காவேரி விரைவு வண்டி) train operated by the Southern Railway which runs between Mysuru Junction and MGR Chennai Central. The train leaves from Mysuru Junction Daily at 21:00 hrs and reaches MGR Chennai Central at 06:45 hrs

The train, during its journey from Mysuru Junction, crosses 20 railway station and terminates at MGR Chennai Central. It takes 9 hours and 45 minutes for this train to complete its entire journey of 497 kilometers.

The return train is 16021.