18203 / Betwa Express
बेतवा एक्सप्रेस

Departs @ 20:10 (Durg Junction)

SunMonTueWedThuFriSat

Arrives @ 13:20 +1 night (Kanpur Central)

SunMonTueWedThuFriSat

The following table shows the schedule of 18203/Betwa Express including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Durg Junction

Betwa Express (18203) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 20:10

PF: 4

Day: 1

Arr.: 20:50

Halt: 5m

Dist: 37.0

Dep.: 20:55

PF: 5

Day: 1

Arr.: 21:26

Halt: 2m

Dist: 75.2

Dep.: 21:28

PF: 2

Day: 1

Arr.: 21:48

Halt: 2m

Dist: 101.3

Dep.: 21:50

PF: -

Day: 1

Arr.: 22:55

Halt: 10m

Dist: 150.8

Dep.: 23:05

PF: 2

Day: 1

Arr.: 00:30

Halt: 2m

Dist: 244.0

Dep.: 00:32

PF: 1

Day: 2

Arr.: 01:15

Halt: 5m

Dist: 294.5

Dep.: 01:20

PF: 4

Day: 2

Arr.: 02:05

Halt: 5m

Dist: 335.3

Dep.: 02:10

PF: 2

Day: 2

Arr.: 04:40

Halt: 10m

Dist: 461.0

Dep.: 04:50

PF: 4

Day: 2

10. MYR / Maihar

Arr.: 06:03

Halt: 2m

Dist: 523.9

Dep.: 06:05

PF: 1

Day: 2

Arr.: 06:55

Halt: 5m

Dist: 559.3

Dep.: 07:00

PF: 2

Day: 2

Arr.: 08:32

Halt: 2m

Dist: 663.8

Dep.: 08:34

PF: 1

Day: 2

13. ATE / Atarra

Arr.: 09:03

Halt: 2m

Dist: 700.7

Dep.: 09:05

PF: 1

Day: 2

14. BNDA / Banda

Arr.: 09:45

Halt: 5m

Dist: 732.7

Dep.: 09:50

PF: 1

Day: 2

15. RGU / Ragaul

Arr.: 10:22

Halt: 2m

Dist: 773.3

Dep.: 10:24

PF: 1

Day: 2

Arr.: 10:40

Halt: 2m

Dist: 790.5

Dep.: 10:42

PF: 1

Day: 2

Arr.: 11:12

Halt: 2m

Dist: 829.5

Dep.: 11:14

PF: 1

Day: 2

Arr.: 13:20

-

Dist: 876.5

Dep.: Dest

PF: 5

Day: 2

Last Updated: 22-Nov-22 21:17 IST
18203 / Betwa Express (बेतवा एक्सप्रेस) train operated by the South East Central Railway which runs between Durg Junction and Kanpur Central. The train leaves from Durg Junction on Sunday, Tuesday at 20:10 hrs and reaches Kanpur Central at 13:20 hrs

The train, during its journey from Durg Junction, crosses 16 railway station and terminates at Kanpur Central. It takes 17 hours and 10 minutes for this train to complete its entire journey of 877 kilometers.

The return train is 18204.