30317 / Majerhat - Dattapukur Local
माझेरहाट - दत्तपुकुर लोकल

Departs @ 16:33 (Majerhat)

SunMonTueWedThuFriSat

Arrives @ 18:22 (Dattapukur)

SunMonTueWedThuFriSat

The following table shows the schedule of 30317/Majerhat - Dattapukur Local including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Majerhat

Majerhat - Dattapukur Local (30317) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 16:33

PF: 4

Day: 1

Arr.: 16:34

Halt: 1m

Dist: 1.0

Dep.: 16:35

PF: 1

Day: 1

Arr.: 16:37

Halt: 1m

Dist: 2.3

Dep.: 16:38

PF: 1

Day: 1

Arr.: 16:43

Halt: 1m

Dist: 5.1

Dep.: 16:44

PF: 2

Day: 1

Arr.: 16:48

Halt: 1m

Dist: 6.3

Dep.: 16:49

PF: 1

Day: 1

Arr.: 16:54

Halt: 1m

Dist: 7.8

Dep.: 16:55

PF: 1

Day: 1

Arr.: 16:58

Halt: 1m

Dist: 9.4

Dep.: 16:59

PF: 1

Day: 1

Arr.: 17:02

Halt: 1m

Dist: 10.4

Dep.: 17:03

PF: 1

Day: 1

Arr.: 17:05

Halt: 1m

Dist: 11.7

Dep.: 17:06

PF: 1

Day: 1

10. TALA / Tala

Arr.: 17:09

Halt: 1m

Dist: 13.4

Dep.: 17:10

PF: 2

Day: 1

Arr.: 17:19

Halt: 2m

Dist: 14.1

Dep.: 17:21

PF: 1

Day: 1

Arr.: 17:26

Halt: 1m

Dist: 16.4

Dep.: 17:27

PF: 1

Day: 1

Arr.: 17:33

Halt: 1m

Dist: 18.0

Dep.: 17:34

PF: 5

Day: 1

Arr.: 17:40

Halt: 1m

Dist: 20.9

Dep.: 17:41

PF: 2

Day: 1

Arr.: 17:43

Halt: 1m

Dist: 22.6

Dep.: 17:44

PF: 3

Day: 1

16. BBT / Birati

Arr.: 17:46

Halt: 1m

Dist: 24.4

Dep.: 17:47

PF: -

Day: 1

Arr.: 17:49

Halt: 1m

Dist: 25.8

Dep.: 17:50

PF: -

Day: 1

Arr.: 17:52

Halt: 1m

Dist: 27.4

Dep.: 17:53

PF: -

Day: 1

Arr.: 17:55

Halt: 1m

Dist: 28.6

Dep.: 17:56

PF: 2

Day: 1

Arr.: 17:58

Halt: 1m

Dist: 31.1

Dep.: 17:59

PF: -

Day: 1

Arr.: 18:05

Halt: 1m

Dist: 33.2

Dep.: 18:06

PF: -

Day: 1

Arr.: 18:11

Halt: 1m

Dist: 37.0

Dep.: 18:12

PF: -

Day: 1

Arr.: 18:22

-

Dist: 40.8

Dep.: Dest

PF: -

Day: 1

Last Updated: 20-Jul-19 19:14 IST
30317 / Majerhat - Dattapukur Local (माझेरहाट - दत्तपुकुर लोकल) train operated by the Eastern Railway which runs between Majerhat and Dattapukur. The train leaves from Majerhat Daily at 16:33 hrs and reaches Dattapukur at 18:22 hrs

The train, during its journey from Majerhat, crosses 21 railway station and terminates at Dattapukur. It takes 1 hours and 49 minutes for this train to complete its entire journey of 41 kilometers.

The return train is 33626.