34122 / Sealdah - Budge Budge Local
सियालदह - बजबज लोकल

Departs @ 08:10 (Sealdah)

SunMonTueWedThuFriSat

Arrives @ 08:58 (Budge Budge)

SunMonTueWedThuFriSat

The following table shows the schedule of 34122/Sealdah - Budge Budge Local including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Sealdah

Sealdah - Budge Budge Local (34122) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 08:10

PF: -

Day: 1

Arr.: 08:17

Halt: 1m

Dist: 5.3

Dep.: 08:18

PF: 2

Day: 1

Arr.: 08:23

Halt: 1m

Dist: 7.9

Dep.: 08:24

PF: 2

Day: 1

Arr.: 08:26

Halt: 1m

Dist: 8.7

Dep.: 08:27

PF: 1

Day: 1

Arr.: 08:29

Halt: 1m

Dist: 9.9

Dep.: 08:30

PF: 1

Day: 1

Arr.: 08:33

Halt: 1m

Dist: 11.6

Dep.: 08:34

PF: 2

Day: 1

Arr.: 08:36

Halt: 1m

Dist: 13.7

Dep.: 08:37

PF: 1

Day: 1

Arr.: 08:40

Halt: 1m

Dist: 16.9

Dep.: 08:41

PF: 1

Day: 1

9. AKRA / Akra

Arr.: 08:44

Halt: 1m

Dist: 19.5

Dep.: 08:45

PF: 2

Day: 1

10. NAI / Nangi

Arr.: 08:48

Halt: 1m

Dist: 22.1

Dep.: 08:49

PF: 3

Day: 1

Arr.: 08:58

-

Dist: 25.6

Dep.: Dest

PF: 1

Day: 1

Last Updated: 24-Jul-19 12:54 IST
34122 / Sealdah - Budge Budge Local (सियालदह - बजबज लोकल) train operated by the Eastern Railway which runs between Sealdah and Budge Budge. The train leaves from Sealdah Daily at 08:10 hrs and reaches Budge Budge at 08:58 hrs

The train, during its journey from Sealdah, crosses 9 railway station and terminates at Budge Budge. It takes 48 minutes for this train to complete its entire journey of 26 kilometers.

The return train is 34121.