37266 / Bandel Jn - Howrah Local
बैण्डेल जं. - हावड़ा लोकल

Departs @ 17:13 (Bandel Junction)

SunMonTueWedThuFriSat

Arrives @ 18:14 (Howrah Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 37266/Bandel Jn - Howrah Local including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Bandel Junction

Bandel Jn - Howrah Local (37266) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 17:13

PF: -

Day: 1

Arr.: 17:14

Halt: 1m

Dist: 2.0

Dep.: 17:15

PF: -

Day: 1

Arr.: 17:17

Halt: 1m

Dist: 3.8

Dep.: 17:18

PF: -

Day: 1

Arr.: 17:20

Halt: 1m

Dist: 6.8

Dep.: 17:21

PF: -

Day: 1

Arr.: 17:23

Halt: 1m

Dist: 9.1

Dep.: 17:24

PF: -

Day: 1

Arr.: 17:26

Halt: 1m

Dist: 11.4

Dep.: 17:27

PF: -

Day: 1

Arr.: 17:29

Halt: 1m

Dist: 15.1

Dep.: 17:30

PF: -

Day: 1

Arr.: 17:33

Halt: 1m

Dist: 17.5

Dep.: 17:34

PF: -

Day: 1

Arr.: 17:36

Halt: 1m

Dist: 19.9

Dep.: 17:37

PF: -

Day: 1

10. RIS / Rishra

Arr.: 17:40

Halt: 1m

Dist: 23.1

Dep.: 17:41

PF: -

Day: 1

Arr.: 17:44

Halt: 1m

Dist: 26.1

Dep.: 17:45

PF: -

Day: 1

Arr.: 17:46

Halt: 1m

Dist: 27.9

Dep.: 17:47

PF: -

Day: 1

Arr.: 17:49

Halt: 1m

Dist: 29.7

Dep.: 17:50

PF: -

Day: 1

14. BLY / Bally

Arr.: 17:51

Halt: 1m

Dist: 31.0

Dep.: 17:52

PF: -

Day: 1

15. BEQ / Belur

Arr.: 17:54

Halt: 1m

Dist: 33.1

Dep.: 17:55

PF: -

Day: 1

16. LLH / Liluah

Arr.: 17:58

Halt: 1m

Dist: 34.7

Dep.: 17:59

PF: -

Day: 1

Arr.: 18:14

-

Dist: 39.4

Dep.: Dest

PF: -

Day: 1

Last Updated: 25-Jul-19 18:32 IST
37266 / Bandel Jn - Howrah Local (बैण्डेल जं. - हावड़ा लोकल) train operated by the Eastern Railway which runs between Bandel Junction and Howrah Junction. The train leaves from Bandel Junction Daily at 17:13 hrs and reaches Howrah Junction at 18:14 hrs

The train, during its journey from Bandel Junction, crosses 15 railway station and terminates at Howrah Junction. It takes 1 hours and 01 minutes for this train to complete its entire journey of 39 kilometers.

The return train is 37265.