51436 / Satara Pune Passenger
सतारा - पुणे पैसेंजर

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 04:30 (Satara)

SunMonTueWedThuFriSat

Arrives @ 08:55 (Pune Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 51436/Satara Pune Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Satara

Satara Pune Passenger (51436) Schedule

1. STR / Satara

Arr.: Source

-

Dist: 0.0

Dep.: 04:30

PF: 1

Day: 1

Arr.: 04:39

Halt: 1m

Dist: 7.6

Dep.: 04:40

PF: -

Day: 1

3. PLV / Palshi

Arr.: 04:49

Halt: 1m

Dist: 16.5

Dep.: 04:50

PF: -

Day: 1

4. WTR / Wathar

Arr.: 04:59

Halt: 1m

Dist: 26.0

Dep.: 05:00

PF: 1

Day: 1

5. AKI / Adarki

Arr.: 05:14

Halt: 1m

Dist: 35.9

Dep.: 05:15

PF: 1

Day: 1

6. SLP / Salpa

Arr.: 05:29

Halt: 1m

Dist: 44.2

Dep.: 05:30

PF: -

Day: 1

Arr.: 05:39

Halt: 1m

Dist: 53.2

Dep.: 05:40

PF: 1

Day: 1

8. NIRA / Nira

Arr.: 05:49

Halt: 1m

Dist: 60.8

Dep.: 05:50

PF: 1

Day: 1

9. WLH / Valha

Arr.: 05:59

Halt: 1m

Dist: 71.2

Dep.: 06:00

PF: 1

Day: 1

10. DNJ / Daundaj

Arr.: 06:14

Halt: 1m

Dist: 79.7

Dep.: 06:15

PF: 1

Day: 1

11. JJR / Jejuri

Arr.: 06:34

Halt: 1m

Dist: 87.5

Dep.: 06:35

PF: 1

Day: 1

Arr.: 06:44

Halt: 1m

Dist: 99.6

Dep.: 06:45

PF: 1

Day: 1

13. ABLE / Ambale

Arr.: 06:54

Halt: 1m

Dist: 104.3

Dep.: 06:55

PF: -

Day: 1

Arr.: 07:14

Halt: 1m

Dist: 113.8

Dep.: 07:15

PF: 1

Day: 1

15. ALN / Alandi

Arr.: 07:24

Halt: 1m

Dist: 122.2

Dep.: 07:25

PF: -

Day: 1

Arr.: 07:29

Halt: 1m

Dist: 128.9

Dep.: 07:30

PF: 1

Day: 1

Arr.: 07:49

Halt: 1m

Dist: 134.3

Dep.: 07:50

PF: 1

Day: 1

Arr.: 07:59

Halt: 1m

Dist: 143.2

Dep.: 08:00

PF: 2

Day: 1

Arr.: 08:55

-

Dist: 145.4

Dep.: Dest

PF: 4

Day: 1

Last Updated: 20-Jul-19 19:43 IST
51436 / Satara Pune Passenger (सतारा - पुणे पैसेंजर) train operated by the Central Railway which runs between Satara and Pune Junction. The train leaves from Satara Daily at 04:30 hrs and reaches Pune Junction at 08:55 hrs

The train, during its journey from Satara, crosses 17 railway station and terminates at Pune Junction. It takes 4 hours and 25 minutes for this train to complete its entire journey of 145 kilometers.

The return train is 51435.