54021 / Bulandshahr - Tilak Bridge Passenger (Unreserved)
बुलंदशहर - तिलक ब्रिज पैसेंजर

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 05:40 (Bulandshahr)

SunMonTueWedThuFriSat

Arrives @ 09:23 (Tilak Bridge)

SunMonTueWedThuFriSat

Note: Running as MEMU with number 64567
The following table shows the schedule of 54021/Bulandshahr - Tilak Bridge Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Bulandshahr

Bulandshahr - Tilak Bridge Passenger (54021) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 05:40

PF: 1

Day: 1

2. BARL / Baral

Arr.: 05:53

Halt: 2m

Dist: 12.1

Dep.: 05:55

PF: 1

Day: 1

Arr.: 06:03

Halt: 1m

Dist: 17.5

Dep.: 06:04

PF: -

Day: 1

Arr.: 06:10

Halt: 2m

Dist: 21.9

Dep.: 06:12

PF: 1

Day: 1

Arr.: 06:23

Halt: 2m

Dist: 32.3

Dep.: 06:25

PF: 1

Day: 1

Arr.: 06:48

Halt: 7m

Dist: 41.4

Dep.: 06:55

PF: 1

Day: 1

Arr.: 07:02

Halt: 1m

Dist: 48.2

Dep.: 07:03

PF: -

Day: 1

Arr.: 07:09

Halt: 2m

Dist: 52.6

Dep.: 07:11

PF: -

Day: 1

9. DS / Dasna

Arr.: 07:25

Halt: 1m

Dist: 64.9

Dep.: 07:26

PF: 1

Day: 1

Arr.: 07:32

Halt: 1m

Dist: 67.4

Dep.: 07:33

PF: -

Day: 1

Arr.: 07:41

Halt: 1m

Dist: 70.9

Dep.: 07:42

PF: 2

Day: 1

Arr.: 07:58

Halt: 2m

Dist: 78.2

Dep.: 08:00

PF: 3

Day: 1

Arr.: 08:09

Halt: 1m

Dist: 84.9

Dep.: 08:10

PF: 3

Day: 1

Arr.: 08:16

Halt: 1m

Dist: 89.3

Dep.: 08:17

PF: 1

Day: 1

Arr.: 08:22

Halt: 1m

Dist: 91.9

Dep.: 08:23

PF: 4

Day: 1

Arr.: 08:45

Halt: 2m

Dist: 98.4

Dep.: 08:47

PF: 12

Day: 1

Arr.: 08:51

Halt: 1m

Dist: 99.8

Dep.: 08:52

PF: 2

Day: 1

Arr.: 09:03

Halt: 2m

Dist: 101.7

Dep.: 09:05

PF: 12

Day: 1

Arr.: 09:10

Halt: 1m

Dist: 102.9

Dep.: 09:11

PF: 2

Day: 1

Arr.: 09:23

-

Dist: 104.1

Dep.: Dest

PF: 2

Day: 1

Last Updated: 01-Jul-19 05:30 IST
54021 / Bulandshahr - Tilak Bridge Passenger (बुलंदशहर - तिलक ब्रिज पैसेंजर) train operated by the Northern Railway which runs between Bulandshahr and Tilak Bridge. The train leaves from Bulandshahr Daily at 05:40 hrs and reaches Tilak Bridge at 09:23 hrs

The train, during its journey from Bulandshahr, crosses 18 railway station and terminates at Tilak Bridge. It takes 3 hours and 43 minutes for this train to complete its entire journey of 104 kilometers.

The return train is 54022.