54022 / Tilak Bridge - Bulandshahr Passenger (Unreserved)
तिलक ब्रिज - बुलंदशहर पैसेंजर

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 18:10 (Tilak Bridge)

SunMonTueWedThuFriSat

Arrives @ 21:55 (Bulandshahr)

SunMonTueWedThuFriSat

Note: Running as MEMU with number 64568
The following table shows the schedule of 54022/Tilak Bridge - Bulandshahr Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Tilak Bridge

Tilak Bridge - Bulandshahr Passenger (54022) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 18:10

PF: 1

Day: 1

Arr.: 18:13

Halt: 1m

Dist: 1.3

Dep.: 18:14

PF: 1

Day: 1

Arr.: 18:25

Halt: 2m

Dist: 2.4

Dep.: 18:27

PF: 6

Day: 1

Arr.: 18:35

Halt: 1m

Dist: 4.3

Dep.: 18:36

PF: 2

Day: 1

Arr.: 18:45

Halt: 2m

Dist: 5.7

Dep.: 18:47

PF: 7

Day: 1

Arr.: 19:02

Halt: 1m

Dist: 12.2

Dep.: 19:03

PF: 3

Day: 1

Arr.: 19:07

Halt: 1m

Dist: 14.8

Dep.: 19:08

PF: 2

Day: 1

Arr.: 19:14

Halt: 1m

Dist: 19.2

Dep.: 19:15

PF: 2

Day: 1

Arr.: 19:35

Halt: 2m

Dist: 26.0

Dep.: 19:37

PF: 1

Day: 1

Arr.: 19:49

Halt: 2m

Dist: 33.3

Dep.: 19:51

PF: -

Day: 1

Arr.: 19:57

Halt: 1m

Dist: 36.7

Dep.: 19:58

PF: -

Day: 1

12. DS / Dasna

Arr.: 20:04

Halt: 1m

Dist: 39.3

Dep.: 20:05

PF: 1

Day: 1

13. PKW / Pilkhua

Arr.: 20:15

Halt: 2m

Dist: 51.6

Dep.: 20:17

PF: -

Day: 1

Arr.: 20:25

Halt: 1m

Dist: 56.0

Dep.: 20:26

PF: -

Day: 1

Arr.: 20:40

Halt: 5m

Dist: 62.8

Dep.: 20:45

PF: -

Day: 1

Arr.: 20:55

Halt: 2m

Dist: 71.8

Dep.: 20:57

PF: 1

Day: 1

Arr.: 21:08

Halt: 2m

Dist: 82.2

Dep.: 21:10

PF: 1

Day: 1

Arr.: 21:17

Halt: 1m

Dist: 86.7

Dep.: 21:18

PF: -

Day: 1

19. BARL / Baral

Arr.: 21:28

Halt: 2m

Dist: 92.0

Dep.: 21:30

PF: 1

Day: 1

Arr.: 21:55

-

Dist: 104.1

Dep.: Dest

PF: 1

Day: 1

Last Updated: 01-Jul-19 05:30 IST
54022 / Tilak Bridge - Bulandshahr Passenger (तिलक ब्रिज - बुलंदशहर पैसेंजर) train operated by the Northern Railway which runs between Tilak Bridge and Bulandshahr. The train leaves from Tilak Bridge Daily at 18:10 hrs and reaches Bulandshahr at 21:55 hrs

The train, during its journey from Tilak Bridge, crosses 18 railway station and terminates at Bulandshahr. It takes 3 hours and 45 minutes for this train to complete its entire journey of 104 kilometers.

The return train is 54021.