54042 / Jind Kurukshetra Passenger (Unreserved)
जिंद - कुरुक्षेत्र पैसेंजर

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 13:05 (Jind Junction)

SunMonTueWedThuFriSat

Arrives @ 16:10 (Kurukshetra Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 54042/Jind Kurukshetra Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Jind Junction

Jind Kurukshetra Passenger (54042) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 13:05

PF: -

Day: 1

Arr.: 13:13

Halt: 1m

Dist: 8.1

Dep.: 13:14

PF: 1

Day: 1

3. UCA / Uchana

Arr.: 13:28

Halt: 1m

Dist: 18.6

Dep.: 13:29

PF: -

Day: 1

4. GSO / Ghaso

Arr.: 13:37

Halt: 1m

Dist: 26.6

Dep.: 13:38

PF: -

Day: 1

Arr.: 13:50

Halt: 3m

Dist: 33.9

Dep.: 13:53

PF: -

Day: 1

Arr.: 14:02

Halt: 1m

Dist: 42.0

Dep.: 14:03

PF: 1

Day: 1

Arr.: 14:15

Halt: 1m

Dist: 50.3

Dep.: 14:16

PF: 1

Day: 1

8. SJM / Sajuma

Arr.: 14:27

Halt: 1m

Dist: 58.8

Dep.: 14:28

PF: 1

Day: 1

Arr.: 14:36

Halt: 1m

Dist: 64.9

Dep.: 14:37

PF: 1

Day: 1

10. KLE / Kaithal

Arr.: 14:45

Halt: 1m

Dist: 71.1

Dep.: 14:46

PF: 1

Day: 1

11. GXG / Geong

Arr.: 15:00

Halt: 1m

Dist: 78.5

Dep.: 15:01

PF: 1

Day: 1

12. TIK / Tik

Arr.: 15:09

Halt: 1m

Dist: 85.1

Dep.: 15:10

PF: 1

Day: 1

Arr.: 15:21

Halt: 1m

Dist: 94.9

Dep.: 15:22

PF: 1

Day: 1

Arr.: 15:29

Halt: 1m

Dist: 99.1

Dep.: 15:30

PF: 1

Day: 1

Arr.: 15:36

Halt: 1m

Dist: 103.9

Dep.: 15:37

PF: 1

Day: 1

Arr.: 15:50

Halt: 1m

Dist: 116.6

Dep.: 15:51

PF: 1

Day: 1

Arr.: 16:10

-

Dist: 120.0

Dep.: Dest

PF: 3

Day: 1

Last Updated: 11-Jul-19 15:59 IST
54042 / Jind Kurukshetra Passenger (जिंद - कुरुक्षेत्र पैसेंजर) train operated by the Northern Railway which runs between Jind Junction and Kurukshetra Junction. The train leaves from Jind Junction Daily at 13:05 hrs and reaches Kurukshetra Junction at 16:10 hrs

The train, during its journey from Jind Junction, crosses 16 railway station and terminates at Kurukshetra Junction. It takes 3 hours and 05 minutes for this train to complete its entire journey of 120 kilometers.

The return train is 54041.