55141 / Banaras - MBDD Pratapgarh Passenger (Unreserved)
बनारस - माँ बेल्हा देवी धाम प्रतापगढ़ पैसेंजर

Departs @ 06:00 (Banaras)

SunMonTueWedThuFriSat

Arrives @ 09:15 (MBDD Pratapgarh Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 55141/Banaras - MBDD Pratapgarh Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Banaras

Banaras - MBDD Pratapgarh Passenger (55141) Schedule

Arr.: Source

-

Dist: 0.0 km

Dep.: 06:00

PF: --

Day: 1

2. LOT / Lohta

Arr.: 06:12

Halt: 1m

Dist: 7.0 km

Dep.: 06:13

PF: --

Day: 1

Arr.: 06:24

Halt: 1m

Dist: 17.0 km

Dep.: 06:25

PF: 1

Day: 1

Arr.: 06:33

Halt: 1m

Dist: 23.7 km

Dep.: 06:34

PF: --

Day: 1

Arr.: 06:42

Halt: 1m

Dist: 28.9 km

Dep.: 06:43

PF: 1

Day: 1

Arr.: 06:52

Halt: 1m

Dist: 37.2 km

Dep.: 06:53

PF: --

Day: 1

Arr.: 07:02

Halt: 1m

Dist: 45.6 km

Dep.: 07:03

PF: 2

Day: 1

8. MOF / Mondh

Arr.: 07:13

Halt: 1m

Dist: 53.8 km

Dep.: 07:14

PF: --

Day: 1

Arr.: 07:23

Halt: 1m

Dist: 61.0 km

Dep.: 07:24

PF: 1

Day: 1

Arr.: 07:34

Halt: 1m

Dist: 71.0 km

Dep.: 07:35

PF: 1

Day: 1

Arr.: 07:47

Halt: 1m

Dist: 76.1 km

Dep.: 07:48

PF: --

Day: 1

Arr.: 08:01

Halt: 1m

Dist: 85.8 km

Dep.: 08:02

PF: 1

Day: 1

Arr.: 08:10

Halt: 1m

Dist: 92.9 km

Dep.: 08:11

PF: 2

Day: 1

14. SWS / Suwansa

Arr.: 08:19

Halt: 1m

Dist: 99.5 km

Dep.: 08:20

PF: --

Day: 1

15. GRX / Gaura

Arr.: 08:27

Halt: 1m

Dist: 105.2 km

Dep.: 08:28

PF: --

Day: 1

Arr.: 08:38

Halt: 1m

Dist: 115.2 km

Dep.: 08:39

PF: 1

Day: 1

Arr.: 08:54

Halt: 1m

Dist: 122.4 km

Dep.: 08:55

PF: --

Day: 1

Arr.: 09:15

-

Dist: 129.2 km

Dep.: Dest

PF: 3

Day: 1

Last Updated: 07-Jan-25 12:58 IST
55141 / Banaras - MBDD Pratapgarh Passenger (बनारस - माँ बेल्हा देवी धाम प्रतापगढ़ पैसेंजर) train operated by the North Eastern Railway which runs between Banaras and MBDD Pratapgarh Junction. The train leaves from Banaras Daily at 06:00 hrs and reaches MBDD Pratapgarh Junction at 09:15 hrs

The train, during its journey from Banaras, crosses 16 railway station and terminates at MBDD Pratapgarh Junction. It takes 3 hours and 15 minutes for this train to complete its entire journey of 129 kilometers.

The return train is 55142.