59232 / Botad Surendranagar Passenger
बोटाद - सुरेंद्रनगर पैसेंजर

Departs @ 07:07 (Botad Junction)

SunMonTueWedThuFriSat

Arrives @ 09:05 (Surendranagar Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 59232/Botad Surendranagar Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Botad Junction

Botad Surendranagar Passenger (59232) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 07:07

PF: -

Day: 1

2. KDI / Kundli

Arr.: 07:16

Halt: 1m

Dist: 11.4

Dep.: 07:17

PF: 1

Day: 1

3. RUR / Ranpur

Arr.: 07:27

Halt: 1m

Dist: 22.2

Dep.: 07:28

PF: 1

Day: 1

Arr.: 07:35

Halt: 1m

Dist: 29.5

Dep.: 07:36

PF: 1

Day: 1

5. CDA / Chuda

Arr.: 07:43

Halt: 1m

Dist: 38.5

Dep.: 07:44

PF: 1

Day: 1

6. LM / Limbdi

Arr.: 07:54

Halt: 1m

Dist: 48.5

Dep.: 07:55

PF: 1

Day: 1

Arr.: 08:22

Halt: 1m

Dist: 68.9

Dep.: 08:23

PF: -

Day: 1

Arr.: 08:28

Halt: 1m

Dist: 72.5

Dep.: 08:29

PF: 1

Day: 1

Arr.: 08:34

Halt: 1m

Dist: 75.2

Dep.: 08:35

PF: 1

Day: 1

Arr.: 09:05

-

Dist: 77.5

Dep.: Dest

PF: -

Day: 1

Last Updated: 20-Jul-19 21:12 IST
59232 / Botad Surendranagar Passenger (बोटाद - सुरेंद्रनगर पैसेंजर) train operated by the Western Railway which runs between Botad Junction and Surendranagar Junction. The train leaves from Botad Junction Daily at 07:07 hrs and reaches Surendranagar Junction at 09:05 hrs

The train, during its journey from Botad Junction, crosses 8 railway station and terminates at Surendranagar Junction. It takes 1 hours and 58 minutes for this train to complete its entire journey of 78 kilometers.

The return train is 59231.