59271 / Surendranagar - Bhavnagar Fast Passenger
सुरेंद्रनगर - भावनगर फास्ट पैसेंजर

Departs @ 13:35 (Surendranagar Junction)

SunMonTueWedThuFriSat

Arrives @ 18:00 (Bhavnagar Terminus)

SunMonTueWedThuFriSat

The following table shows the schedule of 59271/Surendranagar - Bhavnagar Fast Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Surendranagar Junction

Surendranagar - Bhavnagar Fast Passenger (59271) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 13:35

PF: -

Day: 1

Arr.: 13:39

Halt: 1m

Dist: 2.3

Dep.: 13:40

PF: 1

Day: 1

Arr.: 13:45

Halt: 1m

Dist: 5.0

Dep.: 13:46

PF: 1

Day: 1

Arr.: 13:52

Halt: 1m

Dist: 8.6

Dep.: 13:53

PF: -

Day: 1

5. LM / Limbdi

Arr.: 14:09

Halt: 1m

Dist: 28.9

Dep.: 14:10

PF: 1

Day: 1

6. CDA / Chuda

Arr.: 14:22

Halt: 1m

Dist: 39.0

Dep.: 14:23

PF: 1

Day: 1

7. RUR / Ranpur

Arr.: 14:39

Halt: 1m

Dist: 55.3

Dep.: 14:40

PF: 1

Day: 1

Arr.: 15:03

Halt: 27m

Dist: 77.5

Dep.: 15:30

PF: -

Day: 1

Arr.: 15:55

Halt: 5m

Dist: 95.8

Dep.: 16:00

PF: 1

Day: 1

Arr.: 16:12

Halt: 1m

Dist: 103.5

Dep.: 16:13

PF: 1

Day: 1

11. UJ / Ujalvav

Arr.: 16:20

Halt: 1m

Dist: 110.1

Dep.: 16:21

PF: 1

Day: 1

Arr.: 16:33

Halt: 1m

Dist: 120.4

Dep.: 16:34

PF: -

Day: 1

13. SOA / Sanosra

Arr.: 16:42

Halt: 1m

Dist: 131.5

Dep.: 16:43

PF: 1

Day: 1

14. SGD / Songadh

Arr.: 16:52

Halt: 1m

Dist: 141.8

Dep.: 16:53

PF: 1

Day: 1

Arr.: 17:02

Halt: 1m

Dist: 149.3

Dep.: 17:03

PF: -

Day: 1

16. VTJ / Vartej

Arr.: 17:16

Halt: 1m

Dist: 159.8

Dep.: 17:17

PF: 1

Day: 1

Arr.: 17:34

Halt: 1m

Dist: 167.0

Dep.: 17:35

PF: 1

Day: 1

Arr.: 18:00

-

Dist: 169.8

Dep.: Dest

PF: 2

Day: 1

Last Updated: 20-Jul-19 21:15 IST
59271 / Surendranagar - Bhavnagar Fast Passenger (सुरेंद्रनगर - भावनगर फास्ट पैसेंजर) train operated by the Western Railway which runs between Surendranagar Junction and Bhavnagar Terminus. The train leaves from Surendranagar Junction Daily at 13:35 hrs and reaches Bhavnagar Terminus at 18:00 hrs

The train, during its journey from Surendranagar Junction, crosses 16 railway station and terminates at Bhavnagar Terminus. It takes 4 hours and 25 minutes for this train to complete its entire journey of 170 kilometers.

The return train is 59272.