59712 / Suratgarh - Bhatinda Passenger
सूरतगढ़ - भटिंडा पैसेंजर

Departs @ 08:50 (Suratgarh Junction)

SunMonTueWedThuFriSat

Arrives @ 12:30 (Bathinda Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 59712/Suratgarh - Bhatinda Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Suratgarh Junction

Suratgarh - Bhatinda Passenger (59712) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 08:50

PF: -

Day: 1

Arr.: 09:00

Halt: 2m

Dist: 9.0

Dep.: 09:02

PF: 1

Day: 1

Arr.: 09:10

Halt: 1m

Dist: 17.0

Dep.: 09:11

PF: 1

Day: 1

Arr.: 09:19

Halt: 2m

Dist: 24.8

Dep.: 09:21

PF: 1

Day: 1

Arr.: 09:35

Halt: 1m

Dist: 37.5

Dep.: 09:36

PF: 1

Day: 1

Arr.: 09:50

Halt: 10m

Dist: 50.1

Dep.: 10:00

PF: -

Day: 1

7. NAWN / Nawan

Arr.: 10:07

Halt: 1m

Dist: 57.1

Dep.: 10:08

PF: 1

Day: 1

Arr.: 10:13

Halt: 2m

Dist: 61.7

Dep.: 10:15

PF: -

Day: 1

Arr.: 10:28

Halt: 2m

Dist: 76.6

Dep.: 10:30

PF: 1

Day: 1

10. DABN / Dhaban

Arr.: 10:41

Halt: 2m

Dist: 87.2

Dep.: 10:43

PF: 1

Day: 1

Arr.: 10:54

Halt: 2m

Dist: 97.9

Dep.: 10:56

PF: 1

Day: 1

Arr.: 11:05

Halt: 2m

Dist: 106.6

Dep.: 11:07

PF: 1

Day: 1

Arr.: 11:17

Halt: 1m

Dist: 112.9

Dep.: 11:18

PF: 1

Day: 1

14. BWB / Bagwali

Arr.: 11:24

Halt: 2m

Dist: 117.0

Dep.: 11:26

PF: 1

Day: 1

15. SGF / Sangat

Arr.: 11:35

Halt: 2m

Dist: 125.6

Dep.: 11:37

PF: 1

Day: 1

Arr.: 11:45

Halt: 2m

Dist: 132.8

Dep.: 11:47

PF: 1

Day: 1

Arr.: 12:30

-

Dist: 142.5

Dep.: Dest

PF: 1

Day: 1

Last Updated: 17-Jul-19 10:40 IST
59712 / Suratgarh - Bhatinda Passenger (सूरतगढ़ - भटिंडा पैसेंजर) train operated by the North Western Railway which runs between Suratgarh Junction and Bathinda Junction. The train leaves from Suratgarh Junction Daily at 08:50 hrs and reaches Bathinda Junction at 12:30 hrs

The train, during its journey from Suratgarh Junction, crosses 15 railway station and terminates at Bathinda Junction. It takes 3 hours and 40 minutes for this train to complete its entire journey of 143 kilometers.

The return train is 59711.