74671 / Amritsar-Pathankot DMU
अमृतसर - पठानकोट डीएमयू

Departs @ 12:15 (Amritsar Junction)

SunMonTueWedThuFriSat

Arrives @ 15:50 (Pathankot Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 74671/Amritsar-Pathankot DMU including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Amritsar Junction

Amritsar-Pathankot DMU (74671) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 12:15

PF: 1

Day: 1

Arr.: 12:25

Halt: 2m

Dist: 8.2

Dep.: 12:27

PF: 2

Day: 1

Arr.: 12:37

Halt: 2m

Dist: 18.8

Dep.: 12:39

PF: 2

Day: 1

Arr.: 12:48

Halt: 2m

Dist: 28.5

Dep.: 12:50

PF: 2

Day: 1

Arr.: 13:00

Halt: 2m

Dist: 38.7

Dep.: 13:02

PF: 1

Day: 1

Arr.: 13:10

Halt: 1m

Dist: 43.1

Dep.: 13:11

PF: 1

Day: 1

7. CHN / Chhina

Arr.: 13:19

Halt: 2m

Dist: 50.3

Dep.: 13:21

PF: 1

Day: 1

Arr.: 13:38

Halt: 2m

Dist: 57.6

Dep.: 13:40

PF: 1

Day: 1

9. SOHL / Sohal

Arr.: 13:47

Halt: 1m

Dist: 61.1

Dep.: 13:48

PF: 1

Day: 1

10. JHWR / Jhawar

Arr.: 13:54

Halt: 1m

Dist: 65.4

Dep.: 13:55

PF: 1

Day: 1

Arr.: 14:06

Halt: 2m

Dist: 71.4

Dep.: 14:08

PF: 1

Day: 1

Arr.: 14:26

Halt: 2m

Dist: 82.6

Dep.: 14:28

PF: 1

Day: 1

Arr.: 14:43

Halt: 1m

Dist: 87.5

Dep.: 14:44

PF: 1

Day: 1

14. JK / Jakolari

Arr.: 14:52

Halt: 1m

Dist: 94.6

Dep.: 14:53

PF: 1

Day: 1

15. SRM / Sarna

Arr.: 14:58

Halt: 2m

Dist: 99.5

Dep.: 15:00

PF: 1

Day: 1

Arr.: 15:06

Halt: 2m

Dist: 103.9

Dep.: 15:08

PF: 1

Day: 1

Arr.: 15:50

-

Dist: 106.8

Dep.: Dest

PF: 2

Day: 1

Last Updated: 16-Jul-19 13:31 IST
74671 / Amritsar-Pathankot DMU (अमृतसर - पठानकोट डीएमयू) train operated by the Northern Railway which runs between Amritsar Junction and Pathankot Junction. The train leaves from Amritsar Junction Daily at 12:15 hrs and reaches Pathankot Junction at 15:50 hrs

The train, during its journey from Amritsar Junction, crosses 15 railway station and terminates at Pathankot Junction. It takes 3 hours and 35 minutes for this train to complete its entire journey of 107 kilometers.

The return train is 74672.