77212 / Machilipatnam - Vijayawada DEMU
मचिलीपट्णम - विजयवाड़ा डेमू

Departs @ 07:10 (Machilipatnam)

SunMonTueWedThuFriSat

Arrives @ 09:50 (Vijayawada Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 77212/Machilipatnam - Vijayawada DEMU including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Machilipatnam

Machilipatnam - Vijayawada DEMU (77212) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 07:10

PF: -

Day: 1

Arr.: 07:15

Halt: 1m

Dist: 4.5

Dep.: 07:16

PF: 1

Day: 1

3. PAV / Pedana

Arr.: 07:20

Halt: 1m

Dist: 10.4

Dep.: 07:21

PF: -

Day: 1

Arr.: 07:25

Halt: 1m

Dist: 17.9

Dep.: 07:26

PF: 1

Day: 1

Arr.: 07:31

Halt: 1m

Dist: 22.4

Dep.: 07:32

PF: 1

Day: 1

Arr.: 07:37

Halt: 1m

Dist: 25.8

Dep.: 07:38

PF: 1

Day: 1

Arr.: 07:42

Halt: 1m

Dist: 30.8

Dep.: 07:43

PF: 1

Day: 1

Arr.: 08:05

Halt: 2m

Dist: 36.9

Dep.: 08:07

PF: -

Day: 1

Arr.: 08:15

Halt: 1m

Dist: 43.7

Dep.: 08:16

PF: -

Day: 1

Arr.: 08:19

Halt: 1m

Dist: 46.4

Dep.: 08:20

PF: -

Day: 1

Arr.: 08:23

Halt: 1m

Dist: 50.4

Dep.: 08:24

PF: 1

Day: 1

Arr.: 08:28

Halt: 1m

Dist: 54.9

Dep.: 08:29

PF: -

Day: 1

Arr.: 08:34

Halt: 1m

Dist: 57.0

Dep.: 08:35

PF: -

Day: 1

Arr.: 08:39

Halt: 1m

Dist: 60.9

Dep.: 08:40

PF: -

Day: 1

Arr.: 08:54

Halt: 1m

Dist: 66.5

Dep.: 08:55

PF: -

Day: 1

Arr.: 09:04

Halt: 1m

Dist: 72.5

Dep.: 09:05

PF: 1

Day: 1

Arr.: 09:14

Halt: 1m

Dist: 75.8

Dep.: 09:15

PF: 1

Day: 1

Arr.: 09:50

-

Dist: 80.4

Dep.: Dest

PF: 2

Day: 1

Last Updated: 18-Jul-19 17:17 IST
77212 / Machilipatnam - Vijayawada DEMU (मचिलीपट्णम - विजयवाड़ा डेमू) train operated by the South Central Railway which runs between Machilipatnam and Vijayawada Junction. The train leaves from Machilipatnam Daily at 07:10 hrs and reaches Vijayawada Junction at 09:50 hrs

The train, during its journey from Machilipatnam, crosses 16 railway station and terminates at Vijayawada Junction. It takes 2 hours and 40 minutes for this train to complete its entire journey of 80 kilometers.