67228 / Macherla - Vijayawada MEMU
माचेर्ला - विजयवाड़ा मेमू

Departs @ 05:30 (Macherla)

SunMonTueWedThuFriSat

Arrives @ 10:55 (Vijayawada Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 67228/Macherla - Vijayawada MEMU including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Macherla

Macherla - Vijayawada MEMU (67228) Schedule

Arr.: Source

-

Dist: 0.0 km

Dep.: 05:30

PF: 1

Day: 1

Arr.: 05:49

Halt: 1m

Dist: 15.2 km

Dep.: 05:50

PF: 1

Day: 1

Arr.: 06:00

Halt: 1m

Dist: 24.5 km

Dep.: 06:01

PF: 1

Day: 1

Arr.: 06:13

Halt: 2m

Dist: 35.0 km

Dep.: 06:15

PF: --

Day: 1

Arr.: 06:24

Halt: 1m

Dist: 46.4 km

Dep.: 06:25

PF: --

Day: 1

Arr.: 06:33

Halt: 1m

Dist: 56.3 km

Dep.: 06:34

PF: --

Day: 1

Arr.: 06:43

Halt: 1m

Dist: 69.8 km

Dep.: 06:44

PF: --

Day: 1

Arr.: 06:48

Halt: 1m

Dist: 75.9 km

Dep.: 06:49

PF: --

Day: 1

Arr.: 07:00

Halt: 1m

Dist: 87.8 km

Dep.: 07:01

PF: --

Day: 1

Arr.: 07:11

Halt: 1m

Dist: 100.5 km

Dep.: 07:12

PF: --

Day: 1

Arr.: 07:16

Halt: 1m

Dist: 107.2 km

Dep.: 07:17

PF: --

Day: 1

Arr.: 07:23

Halt: 1m

Dist: 116.6 km

Dep.: 07:24

PF: 1

Day: 1

Arr.: 07:31

Halt: 1m

Dist: 125.2 km

Dep.: 07:32

PF: --

Day: 1

Arr.: 09:00

Halt: 5m

Dist: 130.2 km

Dep.: 09:05

PF: --

Day: 1

Arr.: 09:10

Halt: 1m

Dist: 137.1 km

Dep.: 09:11

PF: --

Day: 1

16. NBR / Namburu

Arr.: 09:19

Halt: 1m

Dist: 139.0 km

Dep.: 09:20

PF: --

Day: 1

Arr.: 09:34

Halt: 1m

Dist: 150.4 km

Dep.: 09:35

PF: --

Day: 1

Arr.: 10:24

Halt: 1m

Dist: 157.2 km

Dep.: 10:25

PF: --

Day: 1

Arr.: 10:55

-

Dist: 162.1 km

Dep.: Dest

PF: 9

Day: 1

Last Updated: 07-Jan-25 15:49 IST
67228 / Macherla - Vijayawada MEMU (माचेर्ला - विजयवाड़ा मेमू) train operated by the South Central Railway which runs between Macherla and Vijayawada Junction. The train leaves from Macherla Daily at 05:30 hrs and reaches Vijayawada Junction at 10:55 hrs

The train, during its journey from Macherla, crosses 17 railway station and terminates at Vijayawada Junction. It takes 5 hours and 25 minutes for this train to complete its entire journey of 162 kilometers.

The return train is 67227.