78502 / Bhubaneswar - Cuttack Demu
भुवनेश्वर - कटक डेमू

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 09:50 (Bhubaneswar)

SunMonTueWedThuFriSat

Arrives @ 10:50 (Cuttack Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 78502/Bhubaneswar - Cuttack Demu including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Bhubaneswar

Bhubaneswar - Cuttack Demu (78502) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 09:50

PF: 1

Day: 1

Arr.: 09:55

Halt: 1m

Dist: 3.5

Dep.: 09:56

PF: -

Day: 1

Arr.: 10:02

Halt: 1m

Dist: 6.8

Dep.: 10:03

PF: -

Day: 1

Arr.: 10:08

Halt: 1m

Dist: 9.8

Dep.: 10:09

PF: -

Day: 1

Arr.: 10:14

Halt: 1m

Dist: 16.1

Dep.: 10:15

PF: -

Day: 1

Arr.: 10:22

Halt: 1m

Dist: 23.5

Dep.: 10:23

PF: -

Day: 1

Arr.: 10:28

Halt: 1m

Dist: 26.2

Dep.: 10:29

PF: -

Day: 1

Arr.: 10:50

-

Dist: 27.9

Dep.: Dest

PF: 5

Day: 1

Last Updated: 01-Jul-19 05:30 IST
78502 / Bhubaneswar - Cuttack Demu (भुवनेश्वर - कटक डेमू) train operated by the East Coast Railway which runs between Bhubaneswar and Cuttack Junction. The train leaves from Bhubaneswar Daily at 09:50 hrs and reaches Cuttack Junction at 10:50 hrs

The train, during its journey from Bhubaneswar, crosses 6 railway station and terminates at Cuttack Junction. It takes 1 hours for this train to complete its entire journey of 28 kilometers.

The return train is 78501.