82730 / Kakinada port - Lingampalli Suvidha Special
काकिनाडा पोर्ट - लिंगमपल्ली सुविधा विशेष
(కాకినాడ పోర్ట్ - లింగంపల్లి సువిధ స్పెషల్)

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 21:00 (Kakinada Port)

SunMonTueWedThuFriSat

Arrives @ 09:55 +1 night (Lingampalli)

SunMonTueWedThuFriSat

The following table shows the schedule of 82730/Kakinada port - Lingampalli Suvidha Special including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Kakinada Port

Kakinada port - Lingampalli Suvidha Special (82730) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 21:00

PF: -

Day: 1

Arr.: 21:10

Halt: 5m

Dist: 1.8

Dep.: 21:15

PF: -

Day: 1

Arr.: 21:33

Halt: 2m

Dist: 14.2

Dep.: 21:35

PF: -

Day: 1

Arr.: 21:55

Halt: 2m

Dist: 44.5

Dep.: 21:57

PF: -

Day: 1

Arr.: 22:16

Halt: 2m

Dist: 64.4

Dep.: 22:18

PF: -

Day: 1

Arr.: 22:46

Halt: 2m

Dist: 86.8

Dep.: 22:48

PF: -

Day: 1

Arr.: 23:08

Halt: 2m

Dist: 103.8

Dep.: 23:10

PF: -

Day: 1

Arr.: 23:50

Halt: 2m

Dist: 134.1

Dep.: 23:52

PF: -

Day: 1

Arr.: 00:15

Halt: 2m

Dist: 151.8

Dep.: 00:17

PF: -

Day: 2

Arr.: 00:30

Halt: 2m

Dist: 168.6

Dep.: 00:32

PF: -

Day: 2

Arr.: 01:05

Halt: 2m

Dist: 197.7

Dep.: 01:07

PF: -

Day: 2

Arr.: 02:50

Halt: 5m

Dist: 249.8

Dep.: 02:55

PF: -

Day: 2

13. KMT / Khammam

Arr.: 04:00

Halt: 2m

Dist: 340.3

Dep.: 04:02

PF: -

Day: 2

Arr.: 06:00

Halt: 2m

Dist: 458.0

Dep.: 06:02

PF: -

Day: 2

Arr.: 09:05

Halt: 5m

Dist: 589.7

Dep.: 09:10

PF: -

Day: 2

Arr.: 09:23

Halt: 2m

Dist: 594.5

Dep.: 09:25

PF: -

Day: 2

Arr.: 09:55

-

Dist: 612.7

Dep.: Dest

PF: -

Day: 2

Last Updated: 01-Jul-19 05:30 IST
82730 / Kakinada port - Lingampalli Suvidha Special (काकिनाडा पोर्ट - लिंगमपल्ली सुविधा विशेष / కాకినాడ పోర్ట్ - లింగంపల్లి సువిధ స్పెషల్) train operated by the South Central Railway which runs between Kakinada Port and Lingampalli. The train leaves from Kakinada Port on Thursday at 21:00 hrs and reaches Lingampalli at 09:55 hrs

The train, during its journey from Kakinada Port, crosses 15 railway station and terminates at Lingampalli. It takes 12 hours and 55 minutes for this train to complete its entire journey of 613 kilometers.