95737 / Dadar - Kalyan SemiFast Local
दादर - कल्याण सेमीफ़ास्ट लोकल

Departs @ 19:13 (Dadar Central)

SunMonTueWedThuFriSat

Arrives @ 20:14 (Kalyan Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 95737/Dadar - Kalyan SemiFast Local including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Dadar Central

Dadar - Kalyan SemiFast Local (95737) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 19:13

PF: -

Day: 1

Arr.: 19:19

Halt: 1m

Dist: 6.6

Dep.: 19:20

PF: -

Day: 1

Arr.: 19:23

Halt: 1m

Dist: 10.4

Dep.: 19:24

PF: -

Day: 1

Arr.: 19:35

Halt: 1m

Dist: 21.7

Dep.: 19:36

PF: -

Day: 1

5. TNA / Thane

Arr.: 19:39

Halt: 1m

Dist: 24.3

Dep.: 19:40

PF: -

Day: 1

6. KLVA / Kalva

Arr.: 19:44

Halt: 1m

Dist: 26.7

Dep.: 19:45

PF: -

Day: 1

7. MBQ / Mumbra

Arr.: 19:50

Halt: 1m

Dist: 31.2

Dep.: 19:51

PF: -

Day: 1

Arr.: 19:54

Halt: 1m

Dist: 33.7

Dep.: 19:55

PF: -

Day: 1

9. KOPR / Kopar

Arr.: 19:59

Halt: 1m

Dist: 38.2

Dep.: 20:00

PF: -

Day: 1

10. DI / Dombivli

Arr.: 20:03

Halt: 1m

Dist: 39.4

Dep.: 20:04

PF: 1

Day: 1

Arr.: 20:07

Halt: 1m

Dist: 40.9

Dep.: 20:08

PF: -

Day: 1

Arr.: 20:14

-

Dist: 44.5

Dep.: Dest

PF: -

Day: 1

Last Updated: 08-Aug-19 17:23 IST
95737 / Dadar - Kalyan SemiFast Local (दादर - कल्याण सेमीफ़ास्ट लोकल) train operated by the Central Railway which runs between Dadar Central and Kalyan Junction. The train leaves from Dadar Central Daily at 19:13 hrs and reaches Kalyan Junction at 20:14 hrs

The train, during its journey from Dadar Central, crosses 10 railway station and terminates at Kalyan Junction. It takes 1 hours and 01 minutes for this train to complete its entire journey of 45 kilometers.