97240 / Dombivli - Dadar Slow Local
डोम्बिवली - दादर धीमी लोकल

Departs @ 17:32 (Dombivli)

SunMonTueWedThuFriSat

Arrives @ 18:34 (Dadar Central)

SunMonTueWedThuFriSat

The following table shows the schedule of 97240/Dombivli - Dadar Slow Local including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Dombivli

Dombivli - Dadar Slow Local (97240) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 17:32

PF: 2

Day: 1

2. KOPR / Kopar

Arr.: 17:35

Halt: 1m

Dist: 1.3

Dep.: 17:36

PF: 2

Day: 1

Arr.: 17:40

Halt: 1m

Dist: 5.8

Dep.: 17:41

PF: -

Day: 1

4. MBQ / Mumbra

Arr.: 17:44

Halt: 1m

Dist: 8.2

Dep.: 17:45

PF: -

Day: 1

5. KLVA / Kalva

Arr.: 17:50

Halt: 1m

Dist: 12.7

Dep.: 17:51

PF: -

Day: 1

6. TNA / Thane

Arr.: 17:54

Halt: 1m

Dist: 15.1

Dep.: 17:55

PF: 4

Day: 1

Arr.: 18:00

Halt: 1m

Dist: 17.8

Dep.: 18:01

PF: -

Day: 1

8. NHU / Nahur

Arr.: 18:03

Halt: 1m

Dist: 20.0

Dep.: 18:04

PF: -

Day: 1

Arr.: 18:06

Halt: 1m

Dist: 21.6

Dep.: 18:07

PF: -

Day: 1

Arr.: 18:09

Halt: 1m

Dist: 23.5

Dep.: 18:10

PF: -

Day: 1

11. VK / Vikhroli

Arr.: 18:12

Halt: 1m

Dist: 25.3

Dep.: 18:13

PF: -

Day: 1

Arr.: 18:16

Halt: 1m

Dist: 29.0

Dep.: 18:17

PF: -

Day: 1

Arr.: 18:19

Halt: 1m

Dist: 30.3

Dep.: 18:20

PF: -

Day: 1

Arr.: 18:22

Halt: 1m

Dist: 32.8

Dep.: 18:23

PF: -

Day: 1

15. SIN / Sion

Arr.: 18:26

Halt: 1m

Dist: 35.5

Dep.: 18:27

PF: -

Day: 1

16. MTN / Matunga

Arr.: 18:29

Halt: 1m

Dist: 38.0

Dep.: 18:30

PF: -

Day: 1

Arr.: 18:34

-

Dist: 39.4

Dep.: Dest

PF: -

Day: 1

Last Updated: 11-Aug-19 18:44 IST
97240 / Dombivli - Dadar Slow Local (डोम्बिवली - दादर धीमी लोकल) train operated by the Central Railway which runs between Dombivli and Dadar Central. The train leaves from Dombivli on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday at 17:32 hrs and reaches Dadar Central at 18:34 hrs

The train, during its journey from Dombivli, crosses 15 railway station and terminates at Dadar Central. It takes 1 hours and 02 minutes for this train to complete its entire journey of 39 kilometers.