01044 / Samastipur - Mumbai LTT Special Fare SF Special
समस्तीपुर - मुम्बई लोकमान्य तिलक टर्मिनस विशेष किराया सुपरफास्ट विशेष

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.
The following table shows the schedule of 01044/Samastipur - Mumbai LTT Special Fare SF Special including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Samastipur Junction
.
Departs @ 23:20 (Samastipur Junction)
SMTWTFS
Arrives @ 07:40 +2 nights (Lokmanya Tilak Terminus)
SMTWTFS

Samastipur - Mumbai LTT Special Fare SF Special (01044) Schedule

S#

Code

Station

Arr.

Dept.

Halt

PF

Dist.

Day

Zone

1.

23:20

-

-

0.0

1

ECR

2.

00:20

00:25

5m

-

52.1

2

ECR

3.

01:20

01:25

5m

3

105.9

2

ECR

4.

02:20

02:25

5m

-

126.6

2

ECR

5.

02:43

02:45

2m

-

132.6

2

ECR

6.

03:15

03:17

2m

2

171.9

2

ECR

7.

04:10

04:12

2m

2

240.4

2

ECR

8.

05:50

06:00

10m

-

334.2

2

ECR

9.

08:03

08:05

2m

-

477.6

2

NCR

10.

10:48

10:50

2m

-

570.1

2

NCR

11.

12:10

12:15

5m

-

647.7

2

WCR

12.

12:48

12:50

2m

-

683.2

2

WCR

13.

13:30

13:35

5m

-

746.1

2

WCR

14.

15:25

15:35

10m

-

837.0

2

WCR

15.

18:00

18:02

2m

-

1014.7

2

WCR

16.

19:55

20:05

10m

-

1081.4

2

WCR

17.

22:37

22:40

3m

-

1264.8

2

CR

18.

00:40

00:45

5m

-

1388.3

3

CR

19.

04:00

04:03

3m

3

1645.5

3

CR

20.

05:10

05:15

5m

-

1696.1

3

CR

21.

06:40

06:43

3m

-

1777.6

3

CR

22.

07:40

-

-

1812.2

3

CR

Last Updated: 31-Aug-24 22:02 IST
01044 / Samastipur - Mumbai LTT Special Fare SF Special (समस्तीपुर - मुम्बई लोकमान्य तिलक टर्मिनस विशेष किराया सुपरफास्ट विशेष) train operated by the Central Railway which runs between Samastipur Junction and Lokmanya Tilak Terminus. The train leaves from Samastipur Junction on Friday at 23:20 hrs and reaches Lokmanya Tilak Terminus at 07:40 hrs

The train, during its journey from Samastipur Junction, crosses 20 railway station and terminates at Lokmanya Tilak Terminus. It takes 32 hours and 20 minutes for this train to complete its entire journey of 1812 kilometers.

The return train is 01043.
Loading...