56100 / Erode - Mettur Dam Passenger
इरोड - मेट्टूर बांध पैसेंजर / ஈரோடு - மேட்டூர் அணை பயணிகள்

The following table shows the schedule of 56100/Erode - Mettur Dam Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Erode Junction
.
Departs @ 05:00 (Erode Junction)
SMTWTFS
Arrives @ 08:15 (Mettur Dam)
SMTWTFS

Erode - Mettur Dam Passenger (56100) Schedule

S#

Code

Station

Arr.

Dept.

Halt

PF

Dist.

Day

Zone

1.

05:00

-

3

0.0

1

SR

2.

05:09

05:10

1m

-

4.9

1

SR

3.

05:19

05:20

1m

-

13.5

1

SR

4.

05:29

05:30

1m

-

21.0

1

SR

5.

05:39

05:40

1m

-

26.1

1

SR

6.

05:49

05:50

1m

-

38.8

1

SR

7.

05:59

06:00

1m

-

49.5

1

SR

8.

06:20

07:05

45m

-

59.7

1

SR

9.

07:19

07:20

1m

-

70.8

1

SR

10.

07:39

07:40

1m

1

87.3

1

SR

11.

08:15

-

1

99.9

1

SR

Last Updated: 20-Jul-19 23:28 IST
56100 / Erode - Mettur Dam Passenger (इरोड - मेट्टूर बांध पैसेंजर / ஈரோடு - மேட்டூர் அணை பயணிகள்) train operated by the Southern Railway which runs between Erode Junction and Mettur Dam. The train leaves from Erode Junction Daily at 05:00 hrs and reaches Mettur Dam at 08:15 hrs

The train, during its journey from Erode Junction, crosses 9 railway station and terminates at Mettur Dam. It takes 3 hours and 15 minutes for this train to complete its entire journey of 100 kilometers.

The return train is 56101.
Loading...