56101 / Mettur Dam - Erode Passenger
मेट्टूर बांध - इरोड पैसेंजर / மேட்டூர் அணை - ஈரோடு பயணிகள்

The following table shows the schedule of 56101/Mettur Dam - Erode Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Mettur Dam
.
Departs @ 19:00 (Mettur Dam)
SMTWTFS
Arrives @ 22:10 (Erode Junction)
SMTWTFS

Mettur Dam - Erode Passenger (56101) Schedule

S#

Code

Station

Arr.

Dept.

Halt

PF

Dist.

Day

Zone

1.

19:00

-

1

0.0

1

SR

2.

19:18

19:19

1m

1

12.6

1

SR

3.

19:37

19:38

1m

-

29.0

1

SR

4.

20:10

20:15

5m

-

40.2

1

SR

5.

20:24

20:25

1m

-

50.3

1

SR

6.

20:34

20:35

1m

-

61.1

1

SR

7.

20:49

20:50

1m

-

73.8

1

SR

8.

20:59

21:00

1m

-

78.8

1

SR

9.

21:09

21:10

1m

-

86.4

1

SR

10.

21:24

21:25

1m

-

95.0

1

SR

11.

22:10

-

4

99.9

1

SR

Last Updated: 20-Jul-19 23:28 IST
56101 / Mettur Dam - Erode Passenger (मेट्टूर बांध - इरोड पैसेंजर / மேட்டூர் அணை - ஈரோடு பயணிகள்) train operated by the Southern Railway which runs between Mettur Dam and Erode Junction. The train leaves from Mettur Dam Daily at 19:00 hrs and reaches Erode Junction at 22:10 hrs

The train, during its journey from Mettur Dam, crosses 9 railway station and terminates at Erode Junction. It takes 3 hours and 10 minutes for this train to complete its entire journey of 100 kilometers.

The return train is 56100.
Loading...