56103 / Mettur Dam Salem Passenger
मेट्टुर बांध - सलेम पैसेंजर

The following table shows the schedule of 56103/Mettur Dam Salem Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Mettur Dam
.
Departs @ 08:50 (Mettur Dam)
SMTWTFS
Arrives @ 09:55 (Salem Junction)
SMTWTFS

Mettur Dam Salem Passenger (56103) Schedule

S#

Code

Station

Arr.

Dept.

Halt

PF

Dist.

Day

Zone

1.

08:50

-

1

0.0

1

SR

2.

09:07

09:08

1m

1

12.6

1

SR

3.

09:27

09:28

1m

-

29.0

1

SR

4.

09:55

-

-

40.2

1

SR

Last Updated: 20-Jul-19 23:28 IST
56103 / Mettur Dam Salem Passenger (मेट्टुर बांध - सलेम पैसेंजर) train operated by the Southern Railway which runs between Mettur Dam and Salem Junction. The train leaves from Mettur Dam Daily at 08:50 hrs and reaches Salem Junction at 09:55 hrs

The train, during its journey from Mettur Dam, crosses 2 railway station and terminates at Salem Junction. It takes 1 hours and 05 minutes for this train to complete its entire journey of 40 kilometers.

The return train is 56102.
Loading...